PRR full form and the railway parcel papers: way bill, forwarding note, RR and PMS explained
PRR stands for Progressive Reference Record. It is the reference number the parcel office prints on your parcel way bill, and it identifies the consignment in the railway's Parcel Management System. The papers around it have confusingly similar names, and half the trouble at a parcel counter is two people using different words for the same sheet.
In one line each. The forwarding note is the form you fill in. The parcel way bill, or PWB, is the receipt the railway gives you. The PRR number is the reference printed on that receipt. PMS is the railway's computer system that holds the record. RR, the railway receipt, belongs to goods trains and is not what a parcel sender gets. Bilty is the everyday word for the receipt.
The page has a box that checks the number is the right length, copies it, and opens the railway's own portal, where the record is looked up.
The papers, side by side
| Name | What it is | Who writes it | Who keeps it |
|---|---|---|---|
| Forwarding note | The sender's request and declaration: who, what, how heavy, from where to where | The sender | The parcel office |
| Parcel way bill (PWB) | The railway's receipt for the consignment and the freight paid | The parcel office | The sender, then whoever collects |
| PRR number | The reference on the way bill that identifies the consignment | Generated by the system at booking | It is printed on the way bill |
| Luggage ticket | The receipt for luggage booked against a passenger's own ticket | The luggage office | The passenger |
| Railway receipt (RR) | The receipt for wagon-load goods traffic on goods trains | The goods shed | The consignor of goods |
The forwarding note
Everything starts with this form. The sender fills in their own name and address, the receiver's, the two stations, a description of the contents, the number of packages, the weight, and the value if one is being declared, and signs it. The parcel office weighs and measures the consignment against it. The railway offers an online version, the e-forwarding note, which prepares the form in advance; it does not book the parcel, and the consignment still has to be brought to the counter.
How to fill the forwarding note, field by field
The parcel way bill
When the freight is paid, the parcel office issues the parcel way bill. It records what the railway accepted and what was paid: the stations, the packages, the weight charged, the freight, GST on it, and the percentage charge if a value was declared. It is the paper the consignment is released against. The destination office asks for the original, so it has to travel to whoever will collect, and a lost way bill turns a ten-minute collection into a long one.
The PRR number
The PRR number is the ten-digit reference on the way bill. It is how the consignment is known inside the Parcel Management System from booking to delivery: each time the consignment is loaded, unloaded or delivered, the record under that number is updated. It is what the railway's parcel portal asks for, what the delivery section looks up when you arrive, and what to read out if you ring the booking or destination parcel office.
It is worth photographing the way bill as soon as you have it, for the number alone. The photograph will not release the consignment, but it lets the receiver look the consignment up while the paper is still on its way to them.
PMS, and what 'not found' means
PMS is the Parcel Management System, the railway's computerised booking and record system for parcels. The way bill and its PRR number come out of it, and the railway's parcel portal reads from it. When the portal says a number is not found, it is usually one of three ordinary things: a digit was mistyped, the consignment was delivered and its record closed, or the booking is so recent that it has not reached the system yet. Check the digits against the way bill before assuming anything worse.
RR is a goods word
People often ask for the RR number of a parcel. The railway receipt belongs to goods traffic: wagon-loads on goods trains, booked at a goods shed and handled by the railway's freight system, which is separate from the parcel system and has its own numbers. A box, a bike or a car sent from a parcel office has a parcel way bill and a PRR number. If somebody asks you for the RR number of a parcel, the number they need is the PRR.
Bilty, receipt, challan
At the counter and among transporters the receipt is usually called the bilty, the same word used for a lorry receipt. Whatever the word, it is the parcel way bill that the destination office will ask for.
What to keep, and for how long
- The original parcel way bill, until the consignment has been collected and checked.
- A photograph of it, from the moment it is issued.
- The packer's receipt if you paid one, since packing is not part of the railway's bill.
- After collection, the way bill and any note the parcel office made about damage or shortage, until you are sure there is no claim to make.
Collecting the parcel: free time and wharfage
Railway parcel booking: at the parcel office and online
Waiting on a waitlist? Find out where you stand.
Ask TrainBot AIFree · no app · type your PNR into the chat